Skip to main content

BCORE-29

Pack the Electrical Fatmax
Description

Pack all of the necessary materials into the electrical Fatmax so we can take it to competition. Double check to make sure you got everything.

  • 12 and 18 gauge wires
  • Wire strippers
  • Wire cutters
  • Zip ties
  • Battery beak
  • Wagos
  • CAN Wires
  • Fuses
  • Multimeter
Acceptance Criteria

Everything is packed and ready to go. 

Project

  • Robot Build Biocore
Priority
Medium

Sprint

  • Week 8

Watch list

  • AntonioT-27

Reported by

  • AntonioT-27
Created
Changed
Log