Backlog:
Robot Build Biocore
Backlog:
Robot Build Biocore
Primary tabs
Backlog
Board
Completed
Add a Sprint
Pre-season
Open Sprint
Close Sprint
BCORE-3
Design Protobot dummy corners
J
2
BCORE-7
Wire Swerve Module
BCORE-17
Construct Swerve Modules
BCORE-8
Attach Battery Leads
Week 1
Open Sprint
Close Sprint
BCORE-4
CAD out the Protobot
2
BCORE-5
Build 3 Protobots
BCORE-6
Figure out what subsystems are necessary
F
BCORE-9
Make sure Swerve works with Krakens
F
BCORE-10
Create device layout
Week 2
Open Sprint
Close Sprint
BCORE-15
Write code for subsystems, test functions
F
Week 3
Open Sprint
Close Sprint
BCORE-26
cut parts for subsystem 1
BCORE-20
assemble subsystem 1
BCORE-14
Make sure odo works
F
BCORE-11
Wire Subsystem 1
Week 4
Open Sprint
Close Sprint
BCORE-21
test subsystem 1
BCORE-16
mount subsystem 1
BCORE-27
cut parts for subsystem 2
BCORE-22
assemble subsystem 2
Week 5
Open Sprint
Close Sprint
BCORE-23
test subsystem 2
BCORE-18
mount subsystem 2
BCORE-28
cut parts for subsystem 3
BCORE-12
Wire Subsystem 2
BCORE-13
Wire Subsystem 3
Week 6
Open Sprint
Close Sprint
BCORE-24
assemble subsystem 3
BCORE-25
test subsystem 3
BCORE-19
mount subsystem 3
Week 7
Open Sprint
Close Sprint
Week 8
Open Sprint
Close Sprint
BCORE-29
Pack the Electrical Fatmax
Week 9
Open Sprint
Close Sprint
Backlog
BCORE-30
Check Chassis for Shorts
BCORE-39
cad subsystem 2
BCORE-38
cad subsystem 2
BCORE-37
cad subsystem 1
BCORE-36
brainstorm subsystem 2
BCORE-35
brainstorm subsystem 1
BCORE-34
brainstorm subsystem 1
BCORE-33
prototype subsystem 3
BCORE-32
prototype subsystem 2
BCORE-31
prototype subsystem 1
BCORE-40
cad subsystem 3